Mapping Every Dependency Before Moving Anything
Most migration surprises come from things nobody wrote down: a scheduled job that copies a file at 2am, a report that connects to a server by name, a supplier feed hard-coded to an IP address. Before a single workload moved, we mapped every integration, scheduled task and hard-coded server name across the estate, so problems were found on paper rather than on cutover night.
That map became the wave plan. Low-risk foundations and file shares went first, then reporting, then the ERP database and finally the web store, so each wave proved the next one was safe.
- Integrations, scheduled jobs and server names inventoried
- Workloads grouped into waves by risk and dependency
- A landing zone built in Terraform so environments are repeatable